If you’ve discovered my little corner of the internet – welcome – and I hope you enjoy what I’ve posted so far. My talents lie in writing. NOT in messing about with a wordpress site and I’ve managed to stuff up the lovely slider that was at the top of the page. I’m working on fixing it (or, you know, having someone else fix it as I have now banned myself from doing anything except write content) and I hope that you’ll be patient with me until then.

Why does a bathroom renovation take so long?

When you start thinking about a bathroom renovation, it all seems relatively simple – choose some new tiles, get rid of the mouldy shower curtain, replace the taps and vanity that were last updated in the 1950s and you’re good to go, right? Well, turns out that although it’s often the smallest room in the house, the bathroom can be the room that requires the most trades. Everyone gets a piece of the bathroom action (especially if you’re moving walls and the location of plumbing), from plumbers to waterproofers, to renderers to tilers, electricians and builders. In fact, up to 10 different trades could be involved in even a mid-range bathroom reno (let alone the spa-style retreat you’ve been dreaming about). A lot of trades mean a lot of coordination, scheduling and waiting and it’s important to work with a builder who has access to professional, licensed tradesmen he uses regularly (if you need more convincing, read this post about my sister’s bathroom. Nightmare!).